We use cookies to make Geopier's website a better place. Cookies help to provide a more personalized experience and relevant content for you, and web analytics for us. To learn more about how we use cookies, see our Privacy Policy. By continuing to use this website, you accept the usage of these cookies.
Looking for more information? Access our success stories, technical papers, webinars, videos, and more foundation improvement and ground reinforcement resources.
Yes! There are multiple ways to construct Geopier elements below the groundwater elevation. Temporary casing may be added with the drilled solutions. Alternatively, one of the displacement Geopier systems may be used to allow for aggregate delivery at the bottom of patented system mandrels to ensure that rock is placed at the appropriate elevations.
Yes, Geopier can be installed adjacent to existing water features provided there is adequate soil adjacent to the pier and there are no global stability concerns.
Yes! If the organic content is low (such as buried topsoil), then a Rammed Aggregate Pier® system may be installed through this layer to tag the underlying native soils. If the organic content is high, then a rigid inclusion technology will likely be required provide confinement and limit settlements. We have several rigid inclusion systems including cement treated aggregate piers, Armorpact® piers, grouted Impact® piers, and GeoConcrete® Columns.
The Geopier system is not intended to specifically mitigate shrink/swell potential, but the use of Geopier elements with high bearing pressure foundations will reduce the effect of expansive soil. The geotechnical engineer’s recommendation for expansive soils should still be followed including proper drainage and grading.
Yes, Geopier can be used to support structures in karst topography; however, cement-treated aggregate may be required to prevent pier raveling and/or the introduction of water.
With very few exceptions, Geopier can be used to support just about any size load. It depends on the soil profile, the size of the loads, and the settlement requirements for the project.
Piers can be installed before or after the placement of grade raise fill. Both sequencings have their merits with respect to cost, schedule, etc. We will work with you to figure out what is best for your project.
Geopier+
Recommend the best ground improvement solution with confidence!
Geopier+ is a free geotechnical engineering tool that provides:
Geopier bearing pressure recommendations
Geotechnical report language
Geopier specifications
An assortment of geotechnical engineering calculators